PrL的负能量场

  1. I found at least three IPs in the same subnet are required to make it work,

    I found at least three IPs in the same subnet are required to make it work,

    say, 192.168.30.x/24 :

    First IP: Local ethernet adapter: 192.168.30.1 (I'd like to take a brand new unused subnet.)

    Second IP: Siemens PLCSIM virtual ethernet: 192.168.30.2 (have to be in the same subnet, or the local TIA Portal won't find local virtual PLCs, but can find PLCs from other PCs.)

    Third IP: Virtual PLC instance created by PLCSIM: 192.168.30.3 (more IP consumed with more PLC instances.)


    link

    #plc #plcsim From the PLC community on Reddit

  2. 观影指南:

    观影指南:
    1)线条数量映射调光频率,线条越多调光频率越高。在pwm调光策略下线条数越多越好、线条数量不随亮度改变而发生改变。
    2)白条黑条分别映射高电平低电平,它们的宽度比映射占空比。在同一亮度值下,白条越宽黑条越窄宽度比越大越好。同一台手机屏幕亮度如果保持不变,宽度比也不会变化。
    3)黑条的颜色深浅映射波动深度,颜色越浅越好。
    4)关于条纹滚动速度快慢问题:在同一个摄像机同时拍摄下,条纹的运动速度对比快慢跟几台手机的屏幕刷新率和调光频率有关。条纹的运动速度快慢对于判断频闪来说没有太大意义,因子太多。条纹的移动速度代表着频率差(或者1/N频率差),当闪烁频率和拍照频率完全相等(或者闪烁频率是拍照频率的整数倍)的时候,条纹会静止不动。非常微小的差,都会导致非常大的影响的。

    #tech

  3. #relation

    #relation
    女人一旦开始试探性的问你要钱或者暗示你给她买礼物,潜台词就是在告诉你,你已经不是她的菜,说考验你是否真诚也只不过是她最后的包装而已。你如果舍得下血本,那这段关系还能维持一段时间,如果不行那她连装都不想装下去了。你们永远记住,任何通过协调性交易来维持的关系,本质上都是在变相的财富转移,任何以爱情概念为理由的索取本质上都是在对你进行剥削和压榨。因为人最真实的欲望冲动是来自潜意识层面的触发和运行,根本不受理智层面的控制。换而言之,真正的爱是冲动不理智的。如果一个女人总是在跟你谈条件和标准,那这个女人压根就不爱你,之所以选择跟你在一起不过是把你当成供养者和工具人,让你为她提供稳定的资源、供养和情感支持,从而实现她的个人利益最大化罢了。在这种情况下,你爱的越多失去的也就越多。所以我希望你们能看清楚这种交易关系的本质,女人不会因为你付出的多就更爱你,也别让女人所谓的感动逻辑麻痹你。
    如果你在这段关系中只有付出却得不到等价的回报,那这就不是爱情,而是一场以爱情包装的资源掠夺游戏。任何以索取为核心的感情,本质上都是让你失去更多而她得到了全部。只有当你明白交易关系的本质,守住自己的价值,你才不会被剥削也不会沦为随时可替代的供养者。

  4. 今天想把自己 mihomo config 里面的 ai 相关的规则都改成 geosite 里面的category-ai-!cn,结果提示 geosite 里面找不到这个条目,就手欠更新了crash 的管理脚本、mihomo 版本、geosite 版本

    今天想把自己 mihomo config 里面的 ai 相关的规则都改成 geosite 里面的category-ai-!cn,结果提示 geosite 里面找不到这个条目,就手欠更新了crash 的管理脚本、mihomo 版本、geosite 版本。

    结果启动的时候内存爆掉,路由无限重启。

    只能趁 crash 没起来把配置挪一下`mv /data/ShellCrash/yamls /data/ShellCrash/yamls1`

    浪费了两个小时

    最后是把 shellcrash 恢复到了上一个 stable 分支的版本才解决了,至今没弄清楚到底是 shellcrash\mihomo\geosite 文件中的哪个出了问题。。

    还是备份一下可以用的版本号吧,且用且珍惜= =

    ps 2025-4-14 :已经切换到了rax3000m的openwrt上。经过测试,确实在启动的时候,ram占用会瞬间飙升到500M以上。所以512M跑clash确实很吃紧。可能是因为需要解包geosite.dat的问题。后续考虑把ax6000扩容或者卖掉?


    #network

  5. 网络采购:

    网络采购:

    - 小米电池
    - 小米镜头膜

    - 购物卡2025年底到期 卖出去
    ———————————————
    - 报税也可以租房和买房补贴
    https://linux.do/t/topic/478047/1
    https://linux.do/t/topic/474878
    - 申请一下github 老师版。
    - 给wenqi考试材料
    - 眼底进行检查
    - 观看科目三视频。做灯光测试
    - 火速补充装修知识
    - 216只知道步进(机械臂)和直流电机(传送带)目前的用法,那么变频器和伺服电机有啥用法?
    - 有空给 n1 搞一个给本地 git 用的 socks5 ,使用 xray core
    - 上传运动控制教案
    - 妖火 hostloc nodeseek热榜
    - 216安装气路 安装的差不多了但是应该还少了两三根短转接线 同时还得需要用扳手上紧

    - 调课:1个补课(可以是一节给12周周六,一节给培训)
    - 下周二要交思想汇报笔记
    - 写组网手册【1d】注意最后验证的方法
    - 去二号楼申请使用教室


    #plan

  6. 没事儿在b站看高天的直播

    没事儿在b站看高天的直播
    其实只不过就是高天在不断的回答网友们提出的问题
    发现开成只播放声音,然后加小窗,然后关上屏幕默默的当收音机听,效果也不错

    其中学习到了一个比较好的一个观点

    就是如果不能确定AI写的内容的正确性,那么就不应该用AI.

    成功的使用AI是作为一种辅助,而且能看得懂他写的是啥

    #programming

  7. 作为11tp和12tp,r5g台版的三持机主忠告一下诸位

    作为11tp和12tp,r5g台版的三持机主忠告一下诸位。
    1.绝不要升级系统。即便是MIUI也不要升级。
    2.手机买回来之后,立刻连接电脑,使用adb命令,精简所有可删除的MIUI组件(网上有列表,请自行查询),MIUI卡包和钱包不要删除,如果你要刷公交卡的话。否则也可以删除。
    3.用adb指令删除系统升级组件和反诈组件。
    4.关闭MIUI优化。
    5.关闭手机管家的一切权限。12tp用户可以卸载手机管家的大部分功能。
    6.输入法请使用gb

    from blbl

    #tech

  8. #network

    #network
    终于走通了 he tunnel broker 与目前 ipv6 共存的路!
    核心就是,不要新建 netplan或者 interface文件,直接在原有文件基础上修改。

    还有就是需要注意metric关键字调节有限度

    另外,推荐关闭ra

    下面列举两个 netplan 和 interface 的模板。

    interface:
    root@MiserlyBlushing-VM:~# cat /etc/network/interfaces
    source /etc/network/interfaces.d/*
    # Generated by SolusVM
    auto lo
    iface lo inet loopback
    
    auto eth0
    iface eth0 inet static
       address xx
       netmask 255.255.255.0
       gateway xx
       dns-nameservers 8.8.8.8 8.8.4.4
    
    iface eth0 inet6 static
       address xx
       netmask 64
       gateway xx
       metric 100
    
    auto he-ipv6
    iface he-ipv6 inet6 v4tunnel
        address xx
        netmask 64
        endpoint xx
        local 4xx
        ttl 255
        gateway xx
        # 设置更高的metric值(数值越大优先级越低)
        metric 200




    netplan的模板:

    network:
      version: 2
      ethernets:
        eth0:
          match:
            macaddress: "xx"
          addresses:
          - "xx/64"
          nameservers:
            addresses:
            - 2606:4700:4700::1111
            - 2001:4860:4860::8888
          dhcp4: true
          accept-ra: false
          set-name: "eth0"
          routes:
          - to: "default"
            via: "xx"
            metric: 100
      tunnels:
        he-ipv6:
          mode: sit
          remote: xx
          local: xx
          addresses:
            - "xx/64"
          routes:
            - to: default
              via: "xx"
              metric: 1000


    prompt:
    我的 Linux机器的 netplan 配置是这样:  
      
    [netplan 文件]
    
    我还在想在此基础之上,添加一个 he.net tunnel broker, 官网给出的配置是这样的    
    
    [he tunnel broker 配置]
    
    而且我想让这个 tunnel broker 的优先级别最低,一般不让他走这个ip。那我应该怎么配置?


    如果想加入 routed/64 的 ip,
    那么可以在以上 netplan 的配置基础上,原 client ipv6 后面另起一行,加入 routed/64 的 ip 即可,去一个尾号大点的,比如aedf。client ipv6 不能删掉,必须留着。
    这样这个界面在访问外部 ip 时,默认走这个 routed/64 ip


    设置完后,可以ping6 -I he-ipv6 google.com来验证一下

  9. xray绑定出口网卡

    xray绑定出口网卡
    {
        "inbounds": [
            {
                // 此处省略具体 inbound 配置
                "tag": "inbound-xxx"
            }
        ],
        "outbounds": [
            {
                "protocol": "freedom",
                "streamSettings": {
                    "sockopt": {
                        "tcpFastOpen": true,
                        "interface": "WARP"// 指定使用名为 WARP 的网卡
                    }
                },
                "settings": {
                    "domainStrategy": "AsIs"
                },
                "tag": "my-warp"
            }
        ],
        "routing": {
            "rules": [
                {// 将 inbound 和 outbound 通过路由绑定:inbound-xxx -> my-warp
                    "inboundTag": [
                        "inbound-xxx"
                    ],
                    "network": "tcp,udp",
                    "outboundTag": "my-warp",
                    "type": "field"
                }
            ]
        }
    }

    #network

  10. docker镜像地址总结:

    docker镜像地址总结:
    https://www.wangdu.site/course/2109.html

    最简单的办法,是在compose.yml或者镜像名字前面加上镜像网址

    比如:
    docker pull docker.1ms.run/whyyour/qinglong:debian

    #programming

  11. vercel cli比wrangler好用多了!!

    vercel cli比wrangler好用多了!!

    直接cd到项目目录,执行vercel就行。

    根据引导登录之后,就自动部署了。

    以后更新项目,直接执行vercel —prod,超级简单!!


    ——-
    吐槽一下,原本是想在青龙爬完kb之后,cd到目录运行vercel —prod,但是老是报多个参数,不知道青龙执行的时候自动带了什么参数。

    最后还是直接在py源代码里面用os.system执行了。


    #programming

  12. 新时代被淘汰的不是前端,而是后端? - V2EX

    新时代被淘汰的不是前端,而是后端? - V2EX
    https://v2ex.com/t/1116473#r_15989932

  13. 真诚发问, AI 发展时代,怎么保持自己的竞争力? - V2EX

    真诚发问, AI 发展时代,怎么保持自己的竞争力? - V2EX
    https://www.v2ex.com/t/1116252

    #ai

  14. Mistral推出新API,将PDF文档转换为AI可用的Markdown文件

    Mistral推出新API,将PDF文档转换为AI可用的Markdown文件

    Mistral推出了一款新的OCR API,名为Mistral OCR,旨在将复杂的PDF文档转换为文本文件,以便AI模型更轻松地处理。与大多数OCR API不同,Mistral OCR是多模态API,能够检测并处理文本中的插图和照片,生成带有格式化元素的Markdown文件。Mistral称其OCR模型在处理包含数学表达式、复杂布局或表格的文档时表现优于Google、Microsoft和OpenAI的API,且在非英语文档处理上也有优势。

    TechCrunch

    #ai
    Media is too big
    VIEW IN TELEGRAM